Maintenance of Semi-Automatic and Manual bandsaws
Prevention pays off:
- Increase in process reliability
- Early detection of wear-related failures
- avoidance of consequential damage
- Extending the life of the machine
- Higher resale value
- On-site service by competent MEBA service professionals
- Original MEBA spare and wear parts
MEBAcheck: Comprehensive. Intensive. Reliable.
- band geometry
- saw band guide
- cutting pressure
- jaw geometry
- intervertebral disc storage
- tape speed
- saw frame feed
- belt tension
- Round and flat brushes
- magnetic tape
- Micro and cooling system
- Visual check of switch and control
- propulsion control
- length miter angle
- Check for leaks in the hydraulics
Execution period 4 weeks after receipt of order as part of collective assembly. Price includes travel and working time flat rate. Spare parts are charged at low cost. Limited to one man day (8h). Payable net immediately after invoice.
Login